Compare growing systems, protected structures, production capacity, investment and operating profitability from editable assumptions.

Project area0.50 acre72.0 × 28.0 m · Jodhpur, Rajasthan
NVPH polyhouse

Stacked Tower · Lettuce

Selected crop and growing system are compatible.

ROI statusProvisional
System units1,176based on selected spacing
Plant positions47,040installed capacity
Total funding₹26,61,120CAPEX + working capital
Monthly profit₹0before tax

Project capacity

Total site area2,016 m²
Support/services323 m²
Net growing area1,693 m²
Selected systemStacked Tower
System units1,176
Plant positions47,040

Protected structure

StructureNVPH polyhouse
Applied rate₹1,200/m²
Structure area2,016 m²
Structure cost₹24,19,200
Rates are editable market assumptions. Confirm specification, GST, foundations, transport and installation with the selected supplier.

Growing system

Growing systemStacked Tower
Tower model6 ft — 40 plants
Plant sites/unit40
Applied spacing1.20 m
System capacity1,176 towers

Crop production

CropLettuce
Recommended systemsStacked Tower, NFT, DFT
Crop + turnaround35 + 5 days
Cycles/year9.13
Indicative annual yield67,133 kg
Crop suitability is based on the preliminary PaniPonics compatibility table.

Include in project estimate

Select components and enter unit/lot rates when available.

Editable
1,176 unitAwaiting price
0 channelNot included
0 bucketNot included
0 bagNot included
1 lotAwaiting price
1 lotAwaiting price
1 lotAwaiting price
1 systemAwaiting price
1 systemAwaiting price
1 lotAwaiting price
1 lotAwaiting price
1 lotAwaiting price
1 lotAwaiting price
1 lotAwaiting price
1 lotAwaiting price
1 lotAwaiting price
1 lotAwaiting price
1 lotNot included
1 yearNot included
1 lotNot included
A selected item with no price is shown as “Awaiting price” and keeps CAPEX and ROI provisional.

Investment & operating cost

Protected structure₹24,19,200
Priced components₹0
Contingency₹2,41,920
Fixed investment₹26,61,120
Working capital₹0
Total funding requirement₹26,61,120
Items awaiting price14

Revenue & returns

Applied selling price₹0/kg
Annual revenue₹0
Monthly revenue₹0
Monthly running cost₹0
Monthly operating profit₹0
Profit margin0.0%
Annual ROIProvisional
PaybackNot available
Monthly EMI₹0
Cash flow after EMI₹0
Financial results are preliminary estimates based on entered prices, yield and costs. They are not a guarantee of profit or investment return.

Design decisions and warnings

Crop/system matchThe selected combination is listed as suitable.
Tower preset applied6 ft, 40 plants and 1.2 m default spacing are loaded automatically.
14 selected items awaiting priceROI remains provisional until all selected CAPEX items have prices.
Selling price requiredEnter a realistic selling price per kilogram.
Running costs requiredEnter electricity, labour, consumables, maintenance and logistics.
Pump sizing requires technician verificationPump specifications vary with flow, pressure, pipe length, elevation, filters, fittings and pump curve.
High-temperature design condition44°C peak requires detailed cooling, airflow and shading design.
PaniPonics preliminary farm planning toolValidate agronomy, structure, hydraulics, electrical design and financial assumptions before proceeding.